Ground-facility fire protection • Work enquiries • India

Chandrayaan-3 / ISRO Fire Fighting Works

Discuss ground-facility fire protection work packages with Reliance Fire Protection Systems. Enquiries referring to Chandrayaan-3 or ISRO should identify the exact centre, facility and approved package, with appointment and site permissions confirmed through the responsible project team.

Discuss your facility work packageCall +91 96999 90424
Chandrayaan-3 / ISRO ground-facility fire fighting work enquiries: scope review, system coordination and testing
Illustrative service scope for ground-facility fire protection enquiries.

What fire fighting works can be discussed?

This page covers enquiries about fire protection work packages for ground facilities associated with an identified ISRO project. The exact centre, building, work area and relationship to Chandrayaan-3 must be confirmed in the enquiry and appointment documents.

Identify whether the package concerns a building, utilities, electrical or control room, refurbishment area or another defined ground-facility zone. Select protection around the actual hazard and equipment requirements.

Services are offered by Reliance Fire Protection Systems. This page does not establish ISRO appointment, approval, completed work or participation in the Chandrayaan-3 mission.

Ground-facility fire fighting and protection systems

Hydrants & sprinklers

Discuss piping, valves, hydrants, hose equipment and sprinkler work within the approved package. Confirm design boundaries, material requirements, supports and existing-network interfaces.

Fire detection & alarms

Review suitable detection, alarm notification and control-panel interfaces for the identified rooms and equipment. Confirm environmental suitability and existing-system compatibility.

Equipment & room protection

Discuss suitable suppression for defined electrical, control or equipment room hazards. Review occupancy, enclosure conditions, equipment compatibility and discharge effects.

Special process or test-area hazards require their own engineering scope and competent specialist review. Building fire protection must not be assumed to cover spacecraft, launch systems or mission-critical process equipment.

Work-package and site coordination

Agree the scope and method with the authorised project and facility teams before mobilisation. Current site access, work permits, operating restrictions and the approval route must be confirmed for the exact location.

  • Identify the centre, building, package owner and work boundaries
  • Confirm contractor qualification, induction and authorised access requirements
  • Coordinate existing-system interfaces and any required isolation
  • Agree system impairment controls, work windows and restoration responsibilities
  • Plan installation inspections, test witnesses and acceptance criteria
  • Document approved changes and close-out requirements

Use authorised project information for design coordination. Sensitive facility details should be handled through the project-approved channels.

Design coordination and sensitive equipment areas

Approved drawings & BOQ

Review the issued scope, coordinated layouts, specifications and bill of quantities. Clarify design responsibilities, interfaces, exclusions and inspection requirements.

Equipment compatibility

Assess detector and suppression suitability for the actual equipment and environment. Coordinate discharge, electrical isolation and restoration requirements with the equipment and facility teams.

Alarm & control interfaces

Define the approved alarm and cause-and-effect requirements. Confirm compatibility before modifying existing control or releasing equipment, and plan authorised interface tests.

Inspection, testing, commissioning and handover

Records can include

  • Approved material and equipment information
  • Installation inspection and test reports
  • Pressure or flow test records where specified
  • Alarm and interface cause-and-effect test results
  • As-built drawings and operation and maintenance information
  • Outstanding-items and completion records

Agree the acceptance route

Set inspection points, witnesses, test procedures and acceptance criteria in the appointed work package. Any test affecting existing systems requires the authorised site procedure and permissions.

Completion records relate to the agreed facility works. Statutory approval, client acceptance and any specialist assessment follow the responsible project and authority processes.

Information required for a proposal

Provide the authorised project contact, exact centre and facility, work area, package reference, approved drawings, specifications, BOQ and relevant existing-system information. Include the required approvals, access conditions, work windows and target dates.

Pricing and programme depend on the agreed quantities, equipment, installation conditions, interfaces, inspection and testing. The proposal should define responsibilities, exclusions, handover and maintenance requirements.

Related services: fire hydrant systems · fire alarm systems · fire suppression systems · fire fighting maintenance.

Chandrayaan-3 mission context and facility location

Confirm the actual ground facility

ISRO describes Chandrayaan-3 as a lunar mission with lander, propulsion module and rover elements, and identifies SDSC SHAR, Sriharikota as its launch location on the official Chandrayaan-3 mission details page.

This mission context does not identify the site of a Reliance Fire Protection Systems work package. Confirm the centre, state, building and site access in the enquiry and appointment records.

Service contact: Mumbai, India

Reliance Fire Protection Systems
# 2, Ground Floor, Albion Place, Heritage Compound, Opp. Gloria Church, Sant Savta Marg, Byculla (East), Mumbai - 400 027, Maharashtra, India.

sales@relifire.com
+91 96999 90424

Site visits, engineering scope, mobilisation and work approvals are confirmed through the project proposal and appointment process.

Chandrayaan-3 / ISRO fire fighting works FAQs

What does this Chandrayaan-3 / ISRO fire fighting works page cover?

This page covers enquiries about fire protection work packages for ground facilities associated with an identified ISRO project. The exact centre, building, work area and relationship to Chandrayaan-3 must be confirmed in the enquiry and appointment documents.

Who can I contact for a fire fighting works enquiry?

Contact Reliance Fire Protection Systems at sales@relifire.com or +91 96999 90424. Share the authorised project contact, exact facility, drawings, bill of quantities and expected schedule for a scope discussion.

Is Chandrayaan-3 a site location?

No. Chandrayaan-3 is an ISRO lunar mission. A fire fighting works enquiry must identify the actual ground facility, centre, building and package boundary. The mission name alone does not establish where work is required.

Which fire protection systems can be discussed?

A package discussion can cover hydrants, sprinklers, suitable suppression, fire detection, alarms, interfaces, testing and maintenance. The applicable systems depend on the ground-facility hazards, approved drawings and project specifications.

Can sensitive equipment or electrical rooms be included?

The agreed scope can include suitable protection for defined electrical, control or equipment rooms. Equipment compatibility, enclosure conditions, occupancy and discharge effects must be reviewed with the responsible design and facility teams.

Can existing fire systems be modified?

Any modification requires approval of the work method, system interfaces, isolation, impairment controls, testing and restoration. Existing-system information and the authorised site procedure must be confirmed before work starts.

What information is needed for a proposal?

Share the exact centre and facility, authorised package owner, work boundaries, approved drawings, specifications, BOQ, existing-system details, access requirements and expected dates. Only information authorised for the scope discussion should be supplied.

What records can be included at handover?

Depending on the appointment, records can include material details, inspection and test reports, alarm and interface test results, as-built drawings, operation and maintenance information and an outstanding-items register.

Does this page confirm ISRO approval or Chandrayaan-3 mission participation?

No. This is a service enquiry page. An ISRO appointment, approved work scope, completion status or role in Chandrayaan-3 must be established by the relevant project records; the mission name alone does not establish them.

How are the cost and timeline determined?

Price and timeline depend on the approved scope, quantities, equipment, system interfaces, access, work windows, inspections and testing. A project-specific proposal follows review of the exact facility and package requirements.

Share your facility work package

Discuss ISRO facility fire fighting works

Send your authorised scope, facility details, drawings and expected schedule to Reliance Fire Protection Systems for a discussion.

Email your enquiryContact us

Reliance Fire Protection Systems · Mumbai, India

+91 96999 90424
sales@relifire.com

Scope, appointment, access and work approvals are confirmed with the responsible project and facility teams.