Sprinkler systems
Sprinkler works formed part of the executed fire fighting scope.
Reliance Fire Protection Systems executed fire fighting works at an LNG plant in Maharashtra, India.
The executed scope included fire fighting systems, sprinklers, hydrants, fire alarms, piping and suppression. This project highlight presents the confirmed work category and systems.
Discuss your LNG plant projectCall +91 96999 90424
The executed works covered fire fighting and fire protection systems at an LNG plant facility. Reliance Fire Protection Systems is the works provider for the project described here.
The confirmed project scope included the following systems and works:
Sprinkler works formed part of the executed fire fighting scope.
Hydrant works were included in the executed fire fighting systems package.
Fire alarm works formed part of the confirmed executed scope.
Piping works were included in the LNG plant fire fighting package.
Suppression works were included in the confirmed fire protection scope.
For a new LNG plant enquiry, identify the exact facility, process equipment, work area, hazards and approved engineering scope. Define the project boundaries and interfaces with existing fire protection systems before finalising the work package.
Share approved fire protection drawings, layouts, specifications and the bill of quantities. Identify the responsible design team, package owner and inspection requirements.
Discuss access, tie-ins, system interfaces, work windows and the approvals required for the proposed works. Confirm installation responsibilities and exclusions.
Agree test criteria, witnesses, records and handover requirements in the new appointment. Coordinate any existing-system isolation and restoration through the authorised site process.
This section describes considerations for new project enquiries. The executed scope for the LNG Plant, Maharashtra project is listed above.
LNG means liquefied natural gas. A new fire protection package should define the process areas, storage or handling interfaces, utilities and buildings within its scope. The confirmed executed systems listed above do not, by themselves, identify every area protected or establish suitability for every LNG hazard.
Detection equipment, suppression media, exposure protection and any shutdown interfaces need application-specific engineering. Confirm the actual hazards, equipment compatibility and responsibilities with the plant operator, process supplier and responsible design team.
OISD-STD-194 addresses LNG handling, storage and regasification. NFPA 59A addresses LNG plant fire protection, safety and related requirements. The applicable scope, adopted editions and project requirements must be confirmed for a new appointment.
The proposal should identify systems, quantities, materials, design responsibilities, installation scope, interfaces, inspection and testing, handover and exclusions.
Price and programme depend on the agreed scope and site conditions. Send the project details to sales@relifire.com for a discussion.
Share the actual plant location, proposed work area and approved scope for a new enquiry. Site visits, mobilisation and work arrangements are confirmed for the specific appointment.
The service contact below is the Reliance Fire Protection Systems office.
# 2, Ground Floor, Albion Place, Heritage Compound, Opp. Gloria Church, Sant Savta Marg, Byculla (East), Mumbai - 400 027, Maharashtra, India.
Reliance Fire Protection Systems executed the fire fighting works at LNG Plant, Maharashtra.
The executed scope included fire fighting systems, sprinklers, hydrants, fire alarms, piping and suppression.
Yes. This page highlights fire fighting works executed by Reliance Fire Protection Systems at LNG Plant, Maharashtra.
Contact Reliance Fire Protection Systems at sales@relifire.com or +91 96999 90424 with the plant location, work area, required systems, drawings and timeline for a new project discussion.
Share the plant and work-area details, approved fire protection drawings, specifications, bill of quantities where available, existing-system information, access requirements and expected schedule. The proposal defines scope, interfaces, testing, handover and exclusions.
Yes. Testing and maintenance requirements can be discussed for a new enquiry. The work plan, inspection points, test criteria, shutdown permissions and records are agreed for the specific facility and appointed scope.
The works were executed at an LNG plant in Maharashtra, India, by Reliance Fire Protection Systems.
Send your location, drawings, required scope and expected timeline to Reliance Fire Protection Systems.